2007.11.20
The transitional period for spurious limit change ends on Nov. 30th, 2007.
2007.02.06
The characteristic test method for 5GHz Band Low Power Data Communication System (5.6GHz Out-Door Use) -Japanese only-
2006.12.07
The characteristic test method for 2.4GHz Band Identification of Moving Objects of Specified Low Power Radio Station
2006.10.20
The characteristic test method for Ultra Wide Band Radio System (UWB)
2005.06.03
The characteristic test method for 5.2GHz band Low power data communications system.-Japanese only-